Download this case study as a PDF to keep or share.Imported machinery that couldn’t legally run
Our client, an Australian clay building products manufacturer, needed a compliant, efficient, and fully modernised clay block production line. The imported machinery for the job arrived outdated, unsafe, and not suitable for commercial use in Australia. It lacked compliant electrical systems, automation capability, safety controls, and production-ready integration, so it couldn’t be legally operated or scaled without a complete transformation.
A full electrical and automation rebuild, in-house
Designed full production layout and electrical documentation
Built a custom MSB and 5-chamber MCC for power and control
Developed automation for mixing, pressing and pugmill operation
Installed remote I/O and optimised cable routing
Delivered PLd Cat 3 safety systems and machine risk assessment
Implemented a water-reuse system to reduce waste
Provided ongoing reporting and a long-term maintenance plan
A fully commissioned, audit-ready facility
The finished line is capable of consistent output, with reduced manual handling, improved safety, and automation built to scale, delivered to deadline. As the single contractor on the job, we managed the project end to end: design, panel build, automation, and commissioning, all under one point of contact.
Project Facts
Full Case Study
Get the complete write-up, including project scope and outcomes, as a one-page PDF.
Download PDFA production line automated to run reliably at scale
Delivered as a single, accountable project, from design through to a commissioned, compliant production line.
Efficiency increase through full automation
Reduced manual handling and operational labour costs
Created a scalable platform for future automation upgrades