Oil Refinery: External Tank Farm Automation
A fully integrated electrical and automation upgrade for an Australian oil refining facility’s external tank farm, connecting seamlessly into their existing SCADA platform.
Industry
Oil Refinery
Duration
4.5 Weeks
Project Value
$150,000
Services
SCADA Integration, Control Panels, Automation
Want the full write-up?
Download this case study as a PDF to keep or share.A tank farm that needed to talk to head office
Our client operates a large organic oil refining facility and needed a fully integrated electrical and automation system for their external tank farm. The new system had to connect seamlessly with their existing SCADA platform, support multiple stakeholders including offshore software teams, and deliver safe, reliable control across a wide outdoor site with long cable runs and harsh environmental exposure.
Outdoor-rated control, built for expansion
Collaborated with on-site teams, senior management and offshore programmers to define requirements
Designed complete electrical schematics for wiring, control architecture and network communications
Built two dedicated control panels: one for VSDs and motor control, one for PLC, safety and I/O
Installed remote I/O to minimise cabling and streamline commissioning
Developed an outdoor-rated installation strategy with EMC cabling and weatherproof isolators
Designed cable tray pathways to avoid operational interference and support safe site movement
A tank farm built for future capacity
The site now runs on a modern, fully integrated control system with complete SCADA oversight, reduced cabling requirements, and a scalable architecture built for future tank capacity increases. The project strengthened safety performance and delivered a dependable long-term automation platform for refinery growth.
Project Facts
Full Case Study
Get the complete write-up, including project scope and outcomes, as a one-page PDF.
Download PDFBehind the Build
A tank farm with full SCADA oversight
Delivered in 3.5 weeks with minimal disruption to an operating refinery site.
Integration with the client’s existing SCADA platform
Reduction in cabling requirements on site
Architecture designed for future tank capacity increases
Capabilities Behind This Project
Planning a similar project?
Get an itemised quote, usually within 24 to 48 hours.
