A fully integrated electrical and automation upgrade for an Australian oil refining facility’s external tank farm, connecting seamlessly into their existing SCADA platform.

Industry

Oil Refinery

Duration

4.5 Weeks

Project Value

$150,000

Services

SCADA Integration, Control Panels, Automation

Want the full write-up?

Download this case study as a PDF to keep or share.
Download PDF
The Situation

A tank farm that needed to talk to head office

Our client operates a large organic oil refining facility and needed a fully integrated electrical and automation system for their external tank farm. The new system had to connect seamlessly with their existing SCADA platform, support multiple stakeholders including offshore software teams, and deliver safe, reliable control across a wide outdoor site with long cable runs and harsh environmental exposure.

What We Delivered

Outdoor-rated control, built for expansion

Collaborated with on-site teams, senior management and offshore programmers to define requirements

Designed complete electrical schematics for wiring, control architecture and network communications

Built two dedicated control panels: one for VSDs and motor control, one for PLC, safety and I/O

Installed remote I/O to minimise cabling and streamline commissioning

Developed an outdoor-rated installation strategy with EMC cabling and weatherproof isolators

Designed cable tray pathways to avoid operational interference and support safe site movement

The Result

A tank farm built for future capacity

The site now runs on a modern, fully integrated control system with complete SCADA oversight, reduced cabling requirements, and a scalable architecture built for future tank capacity increases. The project strengthened safety performance and delivered a dependable long-term automation platform for refinery growth.

Project Facts
IndustryOil Refinery
Duration4.5 Weeks
Value$150,000
DeliverySingle Contractor, End to End
Full Case Study

Get the complete write-up, including project scope and outcomes, as a one-page PDF.

Download PDF
By The Numbers

A tank farm with full SCADA oversight

Delivered in 3.5 weeks with minimal disruption to an operating refinery site.

Full SCADA

Integration with the client’s existing SCADA platform

50%

Reduction in cabling requirements on site

Built to Scale

Architecture designed for future tank capacity increases